Zionsville The Towns at Appaloosa

Zionsville The Towns at Appaloosa

Zionsville, IN

The Towns at Appaloosa

HWC worked with Pulte Group to provide site engineering and survey services for the 113-unit residential townhome project located in at the southeast corner of US 421 and CR 300 S behind the Appaloosa Crossing Commercial District in the Town of Zionsville, Indiana.

Development components include:

  • 22 Townhome Buildings
  • Design of a private Street, alleyway, and sidewalk
  • Extensions of public infrastructure for storm sewer, sanitary sewer, and water mains
  • Drainage, detention, and water quality design
  • Landscape, amenity pocket park, and monument sign plans
  • Construction staking

Indianapolis Central Greens

Indianapolis Central Greens

Indianapolis, IN

Central Greens

HWC provided design for M/I Homes for a residential development in Indianapolis, Indiana. The new development included 36 single-family homes and 45 townhomes on nine acres. The improvements included new streets, storm sewers, utilities, and an infiltration basin for stormwater. The site is part of the overall development of Central State on West Washington Street. This urban site provides new homes to infill the existing developed areas that surround the improvements. 

Carmel 116th & College Townhomes (Bellevue)

Carmel 116th & College Townhomes (Bellevue)

Carmel, IN

116th & College Townhomes (Bellevue)

HWC worked with Lennar Homes to create a new townhome community in Carmel, Indiana. The small site developed 49 luxury townhomes on 4 acres. This new community made use of limited space to provide necessary green space and stormwater detention. This site developed in a growing area along 116th Street creating a unique urban lifestyle with connectivity to commercial areas as well as to the Camel Monon Community Center.

Whitestown Cardinal Pointe

Whitestown Cardinal Pointe

Whitestown, IN

Cardinal Pointe

HWC provided site design for Cardinal Pointe, a single-family residential subdivision developed by Pulte and Lennar, in Whitestown, Indiana.

The development consists of 392 lots on 113.49 acres with an amenity area including a pool, pool house, playground, and pickleball courts. The design of this development was completed in five segments and included public infrastructure (road, sanitary, storm, and water), five (5) detention ponds, two entrances from CR 750, floodplain mitigation, and multiple Letter of Map Revisions Based on Fill (LOMR-F) approvals from IDEM.

Construction on this project was completed as follows:

  • Section 2 – Public infrastructure construction was completed in October 2022
  • Section 3 – Public infrastructure construction was completed in February 2023
  • Section 4 – Public infrastructure construction was completed in November 2023
  • Section 5 – Public infrastructure construction was completed in January 2024

Carmel Old Meridian and Main Street

Carmel Old Meridian and Main Street

Carmel, IN

Icon on Main

HWC has provided, and is continuing to provide, site and survey services for the Icon on Main mixed-use development located at the southeast corner of the busy intersection of Old Meridian and Main Street: the gateway into downtown Carmel, Indiana.

Icon on Main is approximately a $75.4 million project with a five-story building, including 22 residential units, 266 luxury apartments, 9,720 SF of office/commercial/retail space, a 585-space public parking garage, and a public plaza. The project also includes two amenity areas (27,300 SF) that required ramps and retaining walls to ensure ADA slopes were provided in every direction within those areas, and the site offers pedestrian and bicycle connectivity to other amenities in the area. The entire development encompasses ± 138,000 SF and 5.6 acres.

The overall site included grading to balance out the earthwork, storm sewer infrastructure, and an underground detention system being utilized underneath the proposed parking garage. The project also included utility service lines to the building along with a water main relocation and a sanitary sewer main extension. The Tax Increment Financing (TIF) from this development will go toward funding the free public parking garage.

HWC has worked closely with the developer, Edward & Sons, and the City of Carmel Redevelopment Commission on the design throughout the entire process. Construction began in August 2023, including demolition, environmental mitigation, and the installation of underground utilities and is expected to be completed in 2026.