by Toni Takacs | Jan 12, 2022
Seymour, IN
Seymour Southern Bypass
HWC Engineering partnered with another firm to complete topographic and route surveying along a four mile route for a new bypass around the south side of the city of Seymour, Indiana.
HWC also coordinated with an aerial mapping firm that provided base topographic mapping and aerial ortho-photos for the project.
HWC acquired additional topographic surveys in some areas due to route realignments and additions.
The total survey fee exceeded $100,000.
by Toni Takacs | Jan 12, 2022
Jeffersonville, IN
8th Street Intersection
HWC Engineering worked with the RiverRidge Reuse Authority to provide topographic route survey services for the 8th Street Intersection Project. HWC utilized traditional survey techniques to complete this job. HWC also utilized drone technology to keep crews safe and increase detail of our delivery.
by Toni Takacs | Jan 10, 2022
Marion County, IN
Modern Rockville Road (Des. 1800035)
HWC was subcontracted by Michael Baker to assist with 6.1 Topographic Survey Collection and prepare the Route Plat and Survey Book for this project. Various data collection techniques were utilized by the project team to complete this phase of the project. The project spanned over 3 miles from I-465 to Raceway Road and includes two adjacent added travel lanes projects and two bridge widening projects under construction contract R-41781.
by Toni Takacs | Jan 10, 2022
Crawfordsville, IN
Downtown Loop Trail – Phase 2
HWC provided topographic survey to support the design services for the Downtown Loop Trail project in Crawfordsville, Indiana.
This multi-phased project was conceptualized in the city’s 2010 Bike and Pedestrian Plan, and the scope includes a 10’ wide trail that will create an urban loop connecting Wabash College to downtown Crawfordsville.
As of January 2018, the project is in the construction document phase and will bid in 2019.
by Toni Takacs | Jan 10, 2022
Clay County, IN
Clay Community Parks – Craig Park
HWC assisted Clay Community Parks with the design and preparation of construction documents for the extension of the Wilmadean Trail at Craig Park in Brazil, Indiana. The project included the construction of a pedestrian bridge with a 50’ span at the north end of the lake at Craig Park. It also included the construction of a stone trail from the pedestrian bridge north to Central Avenue.
HWC provided a topographic survey of the project area for permitting and design purposes, and our surveying will be focused on the bridge portion of the trail and will include cross sections of the stream channel.
Recent Comments