Riley, IN
INDOT Asphalt Resurface & Bridge Replacement with Small Structure
HWC is responsible for the full-time inspection of the construction of INDOT contract RS-40163. This project is approximately 12 miles long and is located in Riley, IN on SR 159 from SR 46 to SR 246.
This contract consists of two projects. The scope of the first project consists of roadway patching, milling, and resurfacing along SR 159 from SR 46 to SR 246. The scope of the second project consists of the removal of an existing bridge and replacing with a small box culvert structure near Blackhawk, IN on SR 159.
The first project remedies pavement failures that were found along the route due to heavy traffic volumes and heavy vehicles. The second project replaces an older structure to remove the potential for failure in the immediate future.
Construction on the contract began in July of 2020 and is expected to be completed by the end of August of 2021. This project is funded by INDOT and FHWA and is expected to cost $7,484,447.82.