Riley, IN
INDOT Asphalt Resurface & Bridge Replacement with Small Structure
HWC was responsible for the inspection of the construction of the INDOT Asphalt Resurface and Bridge Replacement with Small Structure project contract (RS-40163). This project was approximately 12 miles long and located in Riley, Indiana on SR 159 from SR 46 to SR 246.
This contract consisted of two projects. The scope of the first project consisted of roadway patching, milling, and resurfacing along SR 159 from SR 46 to SR 246. The scope of the second project consisted of the removal of an existing pipe culvert and installation of a new three-sided box culvert structure near Blackhawk, Indiana on SR 159.
The first project remedied pavement failures that were found along the route due to heavy traffic volumes and heavy vehicles. The second project replaced an older structure to remove the potential for failure in the immediate future.
Construction on the contract began in July of 2020 and was completed in August of 2021.
This project was funded by INDOT and FHWA, and the construction cost was just over $7 million.