Jackson County, IN
US 50 HHA Overlay, INDOT Seymour District
HWC was assigned to provide design services for the US 50 HMA Overlay project under the INDOT On-Call contract in the Seymour District. HWC extended the functional life of the asphalt overlay by addressing cracks at joint deterioration and longitudinal cracks by construction of partial and full depth patching of the underlying concrete pavement and application of a 2” mill/fill of the asphalt overlay.
Additionally, HWC brought 90 curb ramps to current ADA standards, as well as updated the nine existing traffic signals to have APS devices installed where applicable. This project included two Des No’s and Lewie worked with the District under time constraints to deliver both projects. The project was completed in 2023.