Indianapolis, IN
Washington Street Improvement (DPW)
HWC provided part-time inspection services for the $271,000 Washington Street Improvements project in Indianapolis. The project included removal of a double set of railroad in Washington Street, along with the removal and replacement of curb, sidewalk, ADA ramps, and driveways on Oxford Street, Washington Street, and Parker Avenue. A pedestrian signal was placed on both sides, along with a curb island on Washington Street. HWC was responsible for the inspection of the pedestrian signal, curb, sidewalk, and resurfacing work of Washington Street between Oxford Street and Parker Avenue in Indianapolis, Indiana.