Bethlehem, IN
Nugent Sand & Gravel
HWC is responsible for the full-time inspection of the construction of Camp Creek – Bethlehem Road. This project is 0.665 miles long and is located in Bethlehem, Indiana.
The proposed route is a new segment of road that will connect Camp Creek Road to Bethlehem Road. The proposed road will allow Nugent Sand & Gravel to expand their operations in future years by shifting traffic around their property. At the completion of this project, Camp Creek – Bethlehem Road will be turned over to Clark County and open to through-traffic.
The scope of the project includes clearing the fields and wooded areas within the proposed right-of-way, excavating an existing dirt stockpile, installing drainage culverts and ditches, constructing embankments and side slopes, building and paving the roadway, and installing guardrail, pavement markings, and signage. There is also a four sided concrete box culvert that will be installed at the creek crossing near Bethlehem Road.
Construction on the project began in the summer of 2019. The project was placed on hold through the winter and then construction resumed in April of 2020. The road is expected to be completed in June of 2020.
This project is privately funded by Nugent Sand & Gravel and is expected to cost $1,340,623.55.