Martinsville, IN
Ohio Street Reconstruction
HWC is responsible for the construction inspection of the Ohio Street Reconstruction project in Martinsville, Indiana.
The project consisted of multiple operations including existing utilities coordination, removal of the existing roads, storm water pipe and structures installation, water service connections, full pavement replacement for approximately 3,000 LF, and sidewalk reconstruction for several hundred feet. The pavement and sidewalk reconstruction included new roundabout, truck apron, splitter islands, and curb ramps installation.
Construction began in January 2023 and was completed in late 2023.
The project cost was approximately $3.1 million.